RYK Rates 2026
Grey Structure Rahim Yar Khan Rate: Rs. 2,150 – 2,450 / sq.ft • Full Turnkey A-Class Luxury House: Rs. 3,800 – 4,500 / sq.ft • Semi-Finish Grey + Finishing Labor: Rs. 2,950 – 3,400 / sq.ft • Steel Quality Grade-60 Deformed Saria: 100% Mughal / Amreli Mill Certified • Cement OPC Grade-53: Maple Leaf / Fauji Cement (1:2:4 Ratio) • Warranty Post-Handover Coverage: 12-Month Structural & Seepage Warranty • Office Faisal Road, RYK Hotline: 0300-2678825 / 0300-9678825 •
SHEET 02 / ESTIMATOR

Rahim Yar Khan House Construction Calculator

حساب لگائیں اپنے گھر کی تعمیراتی لاگت کا منٹوں میں۔ Get an instant, realistic budget estimation and item-wise material breakdown based on current Rahim Yar Khan construction market rates (2026).

Min: 500 sq.ft 1,950 sq.ft Max: 10,000 sq.ft
ESTIMATED TOTAL BUDGET
PKR 8,092,500
Bricks, Cement & Aggregates PKR 2,589,600
Grade-60 Steel / Saria PKR 1,618,500
Finishing, Tiles, Sanitary & Paint PKR 2,427,750
Skilled Labor & Site Supervision PKR 1,456,650
Expected Project Timeline 5 – 7 Months

* Rates are based on PEC quality standards and current market price of cement and steel in Rahim Yar Khan. Final price is locked in a written BOQ.

MATERIAL METRICS

Estimated Material Consumption Chart

Standard material requirement estimates for typical double-story houses in Rahim Yar Khan.

House Plot Size Avg. Covered Area Grade-60 Steel Cement Bags Class-A Bricks Sand / Bajri (Cubic Ft)
5 Marla (Double Story) ~1,950 sq.ft 3.8 – 4.2 Tons 750 – 850 Bags 42,000 – 48,000 ~3,200 cu.ft
10 Marla (Double Story) ~3,600 sq.ft 7.2 – 8.0 Tons 1,400 – 1,600 Bags 80,000 – 90,000 ~5,800 cu.ft
1 Kanal (Double Story) ~6,200 sq.ft 13.0 – 15.0 Tons 2,600 – 3,000 Bags 140,000 – 160,000 ~10,500 cu.ft
COST FACTORS

Key Variables Affecting Construction Cost in RYK

Why prices vary between plots and how we ensure no unexpected mid-project surprises.

🧱

Soil & Foundation Depth

Areas near canals or low-lying agricultural lands in Rahim Yar Khan require deeper foundation excavation and compact filling to prevent future settlement cracks.

🛡️

Steel & Cement Fluctuations

We provide a Fixed-Price Escalation Clause in our contract so that minor market fluctuations during the build do not halt your construction.

🎨

Finishing Customization

Tile sizes (60x120 vs 60x60), wood species (Ash wood vs Deodar vs PVC), and imported vs local sanitary fittings significantly define the final turnkey budget.

QUESTIONS

Frequently Asked Questions About Costing

How accurate is this online calculator estimate?
This tool provides an 85% to 90% accurate estimate based on prevailing material and labor costs in Rahim Yar Khan. The exact final price is confirmed in a written itemized BOQ after our engineer visits your plot and checks your architectural drawings.
Do you charge extra for architectural 2D and 3D elevation drawings?
If you sign a turnkey or grey structure construction contract with Mubarak Builders, all architectural floor plans and 3D front elevation designs are 100% complimentary (Free of cost).
What is the difference between Grey Structure and Turnkey?
Grey Structure includes foundation, RCC pillars, beams, roof slab, brick walls, and basic plumbing/electric piping. Full Turnkey includes grey structure plus all finishing: floor tiles, woodwork, paint, sanitary fittings, kitchen cabinets, and lights — ready to live in.
Can I supply my own finishing materials (like tiles or sanitary)?
Yes! We offer a Labor & Supervision Contract (سیمی فنش یا صرف لیبر ریٹ) where we build the grey structure and manage labor, while you choose and purchase your own favorite tiles and fittings.

Need a Written BOQ for Bank Loan or Plot Assessment?

Book a free site inspection in Rahim Yar Khan. Our senior structural engineer will survey your plot and provide a verified cost breakdown.