کوئی پوشیدہ اخراجات نہیں — تحریری BOQ کے ساتھ پکے ریٹس۔ Clear per-square-foot pricing based on current market costs for Grade-60 steel, Grade-53 OPC cement, and skilled site supervision.
Complete structural skeleton built to Pakistan Engineering Council (PEC) specifications.
Key-to-key complete residential package with premium tiling, sanitary, woodwork, and paint.
Ideal for homeowners who want to customize their own sanitary fixtures, paint, and wood cabinets.
Compare the exact materials used in each construction tier before signing your contract.
| Construction Phase | Grey Structure | ⭐ A-Class Turnkey | Luxury Executive |
|---|---|---|---|
| 1. STRUCTURAL MATERIALS | |||
| Steel Reinforcement | Grade-60 (Mughal / Amreli) | Grade-60 (Mughal / Amreli) | Grade-60 (Mughal / Amreli) |
| Cement | OPC Grade-53 (Maple Leaf) | OPC Grade-53 (Maple Leaf) | OPC Grade-53 (Maple Leaf) |
| Bricks | Class-A Local Kiln Bricks | Class-A Local Kiln Bricks | A-Plus Mechanized Clay Bricks |
| 2. FINISHING & INTERIORS | |||
| Floor Tiles | Not Included | Master Porcelain 60x120cm | Spanish / Italian Imported Tiles |
| Doors & Woodwork | Not Included | Solid Ash Wood / Semi-Solid | 100% Solid Burma Teak Wood |
| Sanitary & CP Fittings | Piping Only (Saniplast) | Sonex / Master Luxury Series | Grohe (Germany) / Kohler Series |
| Electric Wiring | Conduits & Boxes Only | Pakistan Cables Pure Copper | Pakistan Cables + Smart Home Prep |
| 3. ENGINEERING & WARRANTIES | |||
| Site Supervision | Resident Civil Engineer | Resident Civil Engineer | Dedicated Senior Project Manager |
| Warranty Period | 6 Months Structural | 12 Months (Structure + Plumbing) | 24 Months Full Coverage |
A transparent breakdown of construction costs for a typical double-story house in Rahim Yar Khan:
When you sign with Mubarak Builders, your itemized rates are contractually locked. We absorb standard short-term supplier fluctuations so that you do not face surprise cost overruns halfway through your build.
You never pay 100% upfront. Payments are divided into 7 physical progress milestones:
Signing of written contract, soil test, and site layout establishment.
Excavation, anti-termite spray, footings, and plinth beam completion.
Columns, brick masonry, and ground floor RCC roof slab casting.
Upper floor structure, top roof slab casting, and parapet walls.
Internal/external plaster, electric wiring, and plumbing pressure tests.
Flooring tile fixing, kitchen cabinets, bathroom sanitary, and paint.
Final inspection, snagging checklist clearance, and key handover.
Schedule a free on-site survey in Rahim Yar Khan. Our civil engineer will measure your plot, review drawings, and deliver a detailed price quotation within 3 working days.